Quantcast
Channel: ArchDaily Global
Viewing all articles
Browse latest Browse all 73914

Flashback: Hearst Tower / Foster and Partners

$
0
0

© Chuck Choi

Architect: Foster and Partners
Location: Midtown Manhattan, New York City, New York,
Project Design: Norman Foster
Structural Engineer: WSP Cantour Seinuk
Construction: Turner Construction
Project Area: 46 stories; 860,000 sq ft 
Project Year: 2003-2006
Photographs: Chuck Choi

© Chuck Choi

The first “green” high rise office building to be completed in New York City, Hearst Tower accurately represents the talent and intellect that drives toward innovative and ground breaking design.

The building’s symmetrically jagged silhouette is easily recognizable in its surroundings. The diagrid facade comprised of triangulated steel frame was designed to use 21% less steel than traditional buildings of it’s type. Also impressive is the statistic which states that 90% of the 10,480 tons of steel used is derived from recycled material.

© Chuck Choi

The glass and steel addition sits atop a six-story cast stone base, which was designed by Joseph Urban in 1928 at a cost of $2 million. Founded by William Randolph Hearst, the 40,000 square feet was designated a Landmark site during the initial designs of the addition. The new tower stands 46 stories tall, housing 80,000 square meters of office space.

Hearst Tower entered the scene at a very important historical moment in American history, as it was the first skyscraper to be built after September 11, 2011. Foster and Partners’ dedication to incomparable design becomes clearer with each project, with the Hearst Tower receiving the 2006 Emporis Skyscraper Award as the best skyscraper of the year in the world.

© Chuck Choi

Foster and Partners pushed the boundaries with their long list of environmental considerations which lead to the designation of Hearst Tower as New York City’s first LEED Gold certified skyscraper. Heat conductive limestone paves the atrium floor, covering polyethylene tubing that circulates water year round to help control the ambient temperature of the building. During the rain, water is collected on the roof and then stored in the basement. This becomes key in the floor tubing, irrigation, and the water sculpture in the lobby.

Icefall, the water sculpture that reaches three stories high, is constructed with thousands of glass panels and also contributes to the thermal conditions of the building by cooling and humidifying the air using the recycled rainwater. Hearst Tower remains at a comfortable temperature for a majority of the year by natural ventilation.

© Chuck Choi

Another obvious way to bring down the financial and environmental costs of the skyscraper is by optimizing the amount of natural light flowing through the building. To maximize the penetration of light, Foster limited the amount of interior walls so as to block less light. Light sensors are used to measure amounts of natural light and react automatically depending on what is needed.

Located at 300 West 57th Street, 959 8th Avenue enar Columbus Circle in Midtown Manhattan, New York, Hearst Tower is the world headquarters of the entire Hearst Corporation housing publications and communications companies like Cosmopolitan, Esquire, Marie Claire, Harper’s Bazaar, Good Houskeeping, and Seventeen.

hearst2 © Chuck Choi hearst11 © Chuck Choi hearst10 © Chuck Choi hearst3 © Chuck Choi hearst9 © Chuck Choi hearst13 © Chuck Choi hearst4 © Chuck Choi hearst6 © Chuck Choi hearst5 © Chuck Choi hearst8 © Chuck Choi hearst7 © Chuck Choi hearst15 Courtesy of Foster and Partners hearst16 Courtesy of Foster and Partners hearst14 Courtesy of Foster and Partners hearst12 Courtesy of Foster and Partners



Viewing all articles
Browse latest Browse all 73914

Trending Articles